Traffic Impact Works

Regulation 4 of the Road Management (Works and Infrastructure) Regulations 2005 defines Traffic Impact Works as works –

  • conducted –
    • on a freeway; or
    • on an arterial road and that require the deviation of vehicular traffic into an on-coming traffic lane; or
    • in a clearway when it is in operation; or
    • on, or partly on, or that affect, a bridge or other structure; or
  • that require the closure to vehicular traffic of a part of a roadway for a continuous period of more than 12 hours or for more than 24 hours in 7 days; or
  • that have a significant impact on road safety, traffic or other infrastructure.

Related Pages

Contributors

The following site members have contributed to this page:

External Links & References

  1. Google Search
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License