Traffic Impact Works
Regulation 4 of the Road Management (Works and Infrastructure) Regulations 2005 defines Traffic Impact Works as works –
- conducted –
- on a freeway; or
- on an arterial road and that require the deviation of vehicular traffic into an on-coming traffic lane; or
- in a clearway when it is in operation; or
- on, or partly on, or that affect, a bridge or other structure; or
- that require the closure to vehicular traffic of a part of a roadway for a continuous period of more than 12 hours or for more than 24 hours in 7 days; or
- that have a significant impact on road safety, traffic or other infrastructure.
Related Pages
Contributors
The following site members have contributed to this page: